How Long Does a Bathroom Remodel Take

January 11th, 2026 | by Nick Kayser

Bathroom remodel timeline guide for East Valley Arizona showing how long a bathroom remodel takes in 2026

How Long Does a Bathroom Remodel Take in the East Valley? (Real Timelines for 2026)

If you’re planning a bathroom remodel in Gilbert, Chandler, Mesa, Tempe, Scottsdale, or Ahwatukee, one of the first questions on your mind is: “How long will my bathroom be out of commission?”

The timeline depends on the scope of work, whether you’re moving plumbing or electrical, material availability, and project complexity. Understanding these timelines upfront helps you plan better and make informed decisions.

Watch: Real Bathroom Remodel Timeline

Here’s a quick look at a recent bathroom transformation we completed in the East Valley:


Average Bathroom Remodel Timelines (Quick Answer)

Here’s what to expect for bathroom remodel timelines in the East Valley:

  • Bathroom Refresh: 1–2 weeks
  • Tub-to-Shower Conversion: 2–3 weeks
  • Full Bathroom Remodel: 3–6 weeks
  • Structural or Layout Changes: 5–8+ weeks

These timelines assume normal conditions—no major surprises behind the walls, materials are in stock, and work proceeds on schedule.

What Impacts Bathroom Remodel Timelines the Most

Plumbing or Electrical Relocations

Moving a toilet, sink, or shower drain adds complexity and time. Rerouting plumbing or electrical often requires opening walls and careful waterproofing—especially in slab foundations common in Gilbert and Chandler homes. These changes can add 1–2 weeks to your timeline.

Custom Tile and Waterproofing

Tile installation is one of the most time-intensive phases. Custom tile showers with intricate patterns or large-format tiles require careful layout and curing time. Waterproofing systems need proper dry time before tile can be installed. Budget 1–2 weeks for quality tile work.

Material Lead Times

Custom vanities, specialty tile, frameless glass shower doors, and high-end fixtures often have lead times of 2–6 weeks. Ordering materials early prevents project delays. Standard materials are typically available within a few days.

Scope Changes Mid-Project

Changing tile selections, adding features, or requesting design changes after the project starts will extend your timeline. Most scope changes add 3–7 days depending on materials and labor availability.

Full Bathroom Remodel Timeline (Week by Week)

Here’s what a typical 4–6 week full bathroom remodel looks like:

  • Week 1: Demolition and rough-in work. Plumbing/electrical relocated if needed.
  • Week 2: Plumbing and electrical finalized. Waterproofing systems installed in shower and wet areas. 24–48 hour cure time required.
  • Week 3: Tile installation (shower walls, floors, tub surrounds). Complexity affects duration—custom patterns take longer.
  • Week 4: Grout applied and sealed. Plumbing fixtures installed. Glass shower measurements taken (1–2 week lead time).
  • Week 5–6: Frameless glass installed. Vanity, countertops, mirrors, and lighting mounted. Final walkthrough.

How Long Does a Shower Remodel Take?

If you’re focusing on just the shower area, timelines are shorter:

Tub-to-Shower Conversion: 2–3 Weeks

Tub-to-shower conversions are one of the most popular bathroom upgrades in the East Valley. This involves removing the bathtub, building a new shower pan, waterproofing, tiling walls and floor, and installing glass doors. Most conversions take 2–3 weeks from start to finish.

Curbless Shower: 3–4+ Weeks

Curbless showers require more precise waterproofing, slope calculations, and drainage planning. In homes with slab foundations (common in Gilbert, Chandler, and Mesa), creating a curbless shower may require cutting into the slab. These projects typically take 3–4 weeks or longer.

Can You Use Your Bathroom During the Remodel?

During demolition, plumbing work, and tile installation, the bathroom will be completely out of service. Water will be shut off, fixtures removed, and the space will be a construction zone.

If you have a guest bathroom or second bathroom, you’ll use that during the remodel. For families with only one bathroom, consider scheduling the remodel during a time when temporary arrangements are manageable—such as when kids are at camp or during a planned vacation.

What Causes Bathroom Remodel Delays?

Even with careful planning, unexpected issues can extend timelines:

  • Hidden Issues: Rotted subfloors, outdated plumbing, or structural concerns discovered during demolition can add 3–7 days.
  • Material Backorders: Out-of-stock tile, vanities, or fixtures can delay projects by days to weeks.
  • Design Changes: Mid-project changes require new materials and additional labor.

How We Keep Bathroom Remodels on Schedule

At Mustache Approved Remodeling, timeline predictability is as important as quality craftsmanship. Here’s how we keep projects on track:

  • Clear Scope and Estimates: We discuss potential challenges upfront—slab foundations, aging plumbing, structural concerns—so there are fewer surprises.
  • Proven Waterproofing: We use industry-standard systems that meet Arizona building codes.
  • Regular Updates: We keep you informed throughout—material arrivals and any unexpected issues.

Frequently Asked Questions

How long does a bathroom remodel take in Arizona?

Most bathroom remodels in Arizona take 3–6 weeks for a full remodel, 2–3 weeks for a tub-to-shower conversion, and 1–2 weeks for a cosmetic refresh.

Is a shower remodel faster than a full bathroom remodel?

Yes. A shower-only remodel typically takes 2–3 weeks. A full bathroom remodel that includes flooring, vanity, lighting, and layout changes takes 4–6 weeks.

Can timelines change once the project starts?

Yes. Unexpected issues can extend the timeline by a few days to a week or more. Working with an experienced contractor who plans for contingencies helps minimize delays.

How much does a bathroom remodel cost in the East Valley?

Bathroom remodel costs vary based on scope, materials, and layout changes. For detailed pricing information, visit our bathroom remodeling costs guide.

Ready to Plan Your Bathroom Remodel?

If you’re planning a bathroom remodel in the East Valley and want a realistic timeline based on your layout and scope, Mustache Approved Remodeling is here to help.

We follow our proven 6-Step Remodeling Process to ensure quality results, clear communication, and zero surprises. We’ll walk you through what to expect and provide a clear timeline so you can plan with confidence.

View our bathroom project gallery or contact Mustache Approved Remodeling to schedule a consultation today.